Curtain wall aluminum veneer installation process

Your current location: Home page >> News >> Industry news

Curtain wall aluminum veneer installation process

Date of release:2018-01-04 Author: Click:


幕墙铝单板


The installation process of the curtain wall aluminum veneer, the curtain wall aluminum veneer is everywhere, and is widely used in the interior decoration, the decoration effect is very good, in addition to the curtain wall aluminum veneer products are very important, the curtain wall aluminum veneer The installation process is also very important, the correct installation is better in the decorative effect, and the details are more refined.

1. Weak line: According to the floor level, the curtain wall aluminum veneer manufacturers follow the design elevation, along the wall, the top level of the ceiling, and find the center point of the room, along the level of the ceiling, centered on the center of the room. Draw a keel bin position line.

2. Install the main keel boom: After playing the top level of the ceiling and the position of the keel, determine the elevation of the lower end of the boom, install the pre-machined boom, and install the hanger with a diameter 8 expansion bolt on the ceiling. The boom is made of 8 round steel and the distance between the slings is controlled within 1200mm.

3, the installation of the main bone: the main keel generally uses C38 light steel keel, the spacing is controlled within 1200mm. The installation is carried out with a hanger attached to the main keel and a boom.

4. Install the side keel: Fix the 25×25mm paint keel with cement nails around the wall according to the requirement of the ceiling height. The distance between the cement nails is not more than 300mm.

5. Install the secondary keel: According to the size of the aluminum veneer of the curtain wall, install the secondary keel that is matched with the plate, and the secondary keel is hung on the main keel by hanging pieces. When the length of the secondary keel needs to be extended, the secondary keel connector is used to connect the opposite ends while hanging the secondary keel, and then straighten and fix.

6. Install the metal plate: When installing and installing the aluminum veneer of the curtain wall, pull a reference line in the direction of the vertical keel in the middle of the assembly area, and align the reference line to both sides. When installing, gently handle it, you must press the sides of the square plate gently in the order of the flanging area, and then push it into the keel and then push it tightly.

7. Cleaning up: After the aluminum veneer of the curtain wall is installed, wipe all the surfaces of the board with cloth, and there must be no dirt or fingerprints.